Permitting & Codes Home Builders

Navigating the Building Permit Process in Central NY

A comprehensive guide to obtaining building permits and navigating code requirements in the Mohawk Valley region.

Understanding the Permit Process

Securing the proper building permits is a critical step in any construction project. This guide outlines the typical permit process for residential construction in the Mohawk Valley.

Types of Permits Required

Building Permits

Required for:

  • New construction
  • Additions and major renovations
  • Structural modifications
  • Deck construction

Electrical Permits

Separate permits needed for:

  • New electrical service
  • Panel upgrades
  • Major wiring modifications

Plumbing Permits

Required for:

  • New plumbing installations
  • System modifications
  • Water/sewer connections

Mechanical Permits

Necessary for:

  • HVAC installations
  • Major system replacements

Permit Application Process

  1. Pre-Application Meeting (recommended)

    • Schedule with local building department
    • Discuss project scope and requirements
    • Clarify code questions
  2. Prepare Documentation

    • Site plans
    • Floor plans and elevations
    • Engineering calculations (if required)
    • Product specifications
  3. Submit Application

    • Complete permit application forms
    • Pay application fees
    • Include all required drawings and documentation
  4. Plan Review

    • Building department reviews for code compliance
    • May request revisions or additional information
    • Timeline varies by municipality (typically 2-4 weeks)
  5. Permit Issuance

    • Pay permit fees
    • Receive approved plans and permit card
    • Post permit card at job site

Required Inspections

Typical inspection schedule:

  • Footing inspection (before pouring)
  • Foundation inspection
  • Rough framing inspection
  • Rough electrical, plumbing, mechanical
  • Insulation inspection
  • Final inspection

Important: Never cover work before inspection. Schedule inspections 24-48 hours in advance.

Common Code Requirements

NYS Residential Code

  • R-value requirements for insulation
  • Egress window specifications
  • Stair and railing dimensions
  • Smoke and CO detector placement

Energy Code Compliance

  • Blower door testing
  • HVAC sizing calculations
  • Lighting efficiency requirements

Municipality-Specific Requirements

Requirements vary by jurisdiction. Always verify local requirements for:

  • Setback requirements
  • Lot coverage limits
  • Height restrictions
  • Architectural review board approval

Best Practices

  1. Submit Complete Applications

    • Incomplete submissions delay approval
    • Include all required documentation upfront
  2. Maintain Communication

    • Respond promptly to reviewer questions
    • Schedule inspections proactively
  3. Keep Records

    • Document all correspondence
    • Maintain copies of approved plans
    • Track inspection results
  4. Stay Current

    • Code requirements change
    • Attend HBRMV training sessions
    • Subscribe to code update notifications

Resources

Need Assistance?

HBRMV offers code compliance training and support for members. Contact us for information on upcoming workshops or to speak with a technical advisor.